The option set, not one answer
You define the configurations and the variables that matter. The engine sizes and costs every one of them, then ranks the field on net present cost so the trade-off is visible instead of assumed.
FEL equipment sizing and capital cost estimation for mining
Gate deadlines force teams to price two or three configurations and commit. Alpha-Val Pro sizes and costs the full field of options, so the decision is made against what is possible, not just what there was time for.
Total installed cost range per configuration, USD millions
| Configuration | TIC range | NPC $/t | Delta |
|---|---|---|---|
| OPT-01 Jaw + single-deck scalp |
44 – 60 | 1.46 | base |
| OPT-04 Jaw + double-deck scalp |
41 – 55 | 1.38 | −5.5% |
| OPT-07 Gyratory + surge bin |
52 – 71 | 1.51 | +3.4% |
| OPT-11 Jaw + cone, closed circuit |
58 – 78 | 1.44 | −1.4% |
| OPT-14 Jaw + scalp, 14 d ROM surge |
46 – 62 | 1.33 | −8.9% |
TIC: total installed cost · NPC: net present cost per tonne
Five configurations, Class 5 bands. Not a false-precision leaderboard. Every number traces back to a sized piece of equipment and a cost source. Class 5 · −30% / +50%.
The problem
A study prices a small set of configurations because each one demands manual sizing, assumptions and costing. Under gate pressure, teams evaluate two or three configurations and commit to one of them.
You define the configurations and the variables that matter. The engine sizes and costs every one of them, then ranks the field on net present cost so the trade-off is visible instead of assumed.
Every value carries a source, a firmness and a basis, including the ones we assumed for you, with the assumption named. A gate committee can retrieve why a number is what it is, not just what it is.
The language model reads documents and extracts parameters. It never does arithmetic. Sizing and costing run on published methods: Bond, CEMA, Jenike, Karra. Your engineers can check by hand.
A scope of work, a design basis, or a published feasibility study. Whatever format it arrives in.
What is missing, what we will assume, and on whose authority. Itemised and routed to the person who owns it.
Each item sized by a published method, with every input and intermediate value inspectable.
Installed cost bands, net present cost per ton, and the configuration that wins, with the field it beat.
Sample study
We are preparing a worked example from a published NI 43-101 feasibility study, anonymised. Same ore handling and crushing circuit, same option set, same bands you would get on your own scope. No upload, no account.
Your data
You do not have to send real numbers. Scale or offset your figures before they reach us. As long as the values stay internally consistent, the sizing and the comparison hold, and the real basis never leaves your side.
Twenty minutes, one of your existing studies, and we will show you the option field around the configuration you picked.