FEL equipment sizing and capital cost estimation for mining

Evaluate 20 CAPEX options. Not 3.

Gate deadlines force teams to price two or three configurations and commit. Alpha-Val Pro sizes and costs the full field of options, so the decision is made against what is possible, not just what there was time for.

Ore handling and crushing · 2,000 stph · Class 5 Illustrative

Total installed cost range per configuration, USD millions

Configuration TIC range NPC $/t Delta
OPT-01
Jaw + single-deck scalp
44 – 60 1.46 base
OPT-04
Jaw + double-deck scalp
41 – 55 1.38 −5.5%
OPT-07
Gyratory + surge bin
52 – 71 1.51 +3.4%
OPT-11
Jaw + cone, closed circuit
58 – 78 1.44 −1.4%
OPT-14
Jaw + scalp, 14 d ROM surge
46 – 62 1.33 −8.9%

TIC: total installed cost · NPC: net present cost per tonne

Five configurations, Class 5 bands. Not a false-precision leaderboard. Every number traces back to a sized piece of equipment and a cost source. Class 5 · −30% / +50%.

For Miners. By Miners.

Engineers overlooking an open-pit mine, with illustrative cost charts drawn over the scene

The problem

The better option usually exists. Nobody had time to price it.

A study prices a small set of configurations because each one demands manual sizing, assumptions and costing. Under gate pressure, teams evaluate two or three configurations and commit to one of them.

The option set, not one answer

You define the configurations and the variables that matter. The engine sizes and costs every one of them, then ranks the field on net present cost so the trade-off is visible instead of assumed.

Every number traces to its source

Every value carries a source, a firmness and a basis, including the ones we assumed for you, with the assumption named. A gate committee can retrieve why a number is what it is, not just what it is.

The AI never does the math

The language model reads documents and extracts parameters. It never does arithmetic. Sizing and costing run on published methods: Bond, CEMA, Jenike, Karra. Your engineers can check by hand.

Scope in. Costed options out.

See the full workflow
  1. Step 01

    Scope goes in

    A scope of work, a design basis, or a published feasibility study. Whatever format it arrives in.

  2. Step 02

    Screening gate

    What is missing, what we will assume, and on whose authority. Itemised and routed to the person who owns it.

  3. Step 03

    Sizing

    Each item sized by a published method, with every input and intermediate value inspectable.

  4. Step 04

    Costed options out

    Installed cost bands, net present cost per ton, and the configuration that wins, with the field it beat.

Sample study

Run a real circuit before you send us anything.

We are preparing a worked example from a published NI 43-101 feasibility study, anonymised. Same ore handling and crushing circuit, same option set, same bands you would get on your own scope. No upload, no account.

Your data

You do not have to send real numbers. Scale or offset your figures before they reach us. As long as the values stay internally consistent, the sizing and the comparison hold, and the real basis never leaves your side.

Bring us a circuit you already costed.

Twenty minutes, one of your existing studies, and we will show you the option field around the configuration you picked.